Congo

SUBSIDIAIRY NAME COUNTRY SECTOR/INDUSTRY OWNERSHIP % ACQUISITION DATE ACQUISITION VALUATION TOTAL ASSET VALUATION
IIB KATENDE REP. DEM. CONGO ENERGY 100% IIB-DG JUNE 8,2020 300 MILLION USD 3 BILLION USD
ENVOLCO SARI REP. DEM. CONGO ENERGY 30% IIB-DG DECEMBER 2, 2020 175 MILLION USD 1.7 BILLION USD
IIB BOBINDO REP. DEM. CONGO ENERGY 100% IIB-DG JUNE 8TH 2020 300 MILLION USD 3 BILLION USD
BIOPHARCO REP. DEM. CONGO PHARMACEUTICAL 35% IIB-DG OCTOBER 20TH, 2020 345 MILLION USD 3.45 BILLION USD
PARADIGMA SOCIETE DROIT SARL, DR CONGO REP. DEM. CONGO ENERGY 70% IIB-DG APR 22, 2022 249.8 MILLION USD 2.4 BILLION USD
DAM DEVELOMENT INT. RDC, S.A.R.L REP. DEM. CONGO ENERGY 70% IIB-DG APR 18, 2022 11.27 BILLION USD 112.7 BILLION USD
MR TCHUKUBUTA BYAOMBE NEHRMIE REP. DEM. CONGO ENERGY 70% IIB-DG MAR 28, 2022 11.27 BILLION USD 112.7 BILLION USD
Waste to Energy and Photovoltaic Power
Generations
REP. DEM. CONGO ENERGY 70% IIB-DG MAY 16, 2022 535 MILLION USD 5.35 BILLION USD
CONSTRUCTION OF TRANSMISSION PIPELINE AND
HYDROCARBON STORAGE DEPOTS
REP. DEM. CONGO PROCESS ENGINEERING & DESIGN 70% IIB-DG MAY 22, 2022 400 MILLION USD 4 BILLION USD
CONSTRUCTION OF MODULAR REFINERY REP. DEM. CONGO PROCESS ENGINEERING & DESIGN 70% IIB-DG MAY 22, 2022 415 MILLION USD 4.15 BILLION USD
WASTE TO ENERGY AND PHOTOVOLTAIC POWER GENERATIONS REP. DEM. CONGO ENERGY 70% IIB-DG MAY 16, 2022 535 MILLION USD 5.35 BILLION USD

ENERGY, OIL REFINERY, and GAS

IIB KATENDE: IIB-DG acquired IIB Katende on June 8, 2020, for the development, construction, and operation of a 300 MW Hydro-power to power generation facility and accompanying infrastructure to be located in DRC. Under 25 years’ concession, IIB-DG will develop, construct and operate a 300 MW Power plant located in South Ubangi, DRC. Under the 25-year PPA, IIB-DG will sell power to the Province of South Ubangi, Export power to Central Africa and the Republic of Congo, with whom South Ubangi shares borders.

The Project will help meet this increasing demand. By providing more efficient baseload power, the Project will help improve the energy supply and price stability. The Project will also assist in achieving the country’s goal of diversifying its generation base and reducing reliance on imported energy.

DAM DRC SARL AND CSR SOLUTIONS: IIB-DG, on December 2, 2020, acquired DAM DRC SARL and CSR Solutions in DR CONGO. The funds will be used to obtain and procure EPC contractors to construct an oil refinery facility in the South Kivu Region. IIB is authorized to carry on business in Onshore and Offshore Oil & Gas services, serve as representatives of foreign oil and gas projects and service companies, provide general oil & Gas consulting services, and has just added an oil refinery to its business lines.

PARADIGMA SOCIETE DROIT SARL: IIB-DG acquires PARADIGMA SOCIETE DROIT SARL Develop clean energy – focus on solar power production. Clean power produced will support the needs of businesses and the local population. The effort will support environmental conservation by reducing reliance on fossil fuels. The total capacity planned is 180 MW. Eastern DRC has suitable conditions for solar production, with over 3942-daylight hours annually. New power plants supply electricity to over 1.0 million people.

DAM DEVELOPMENT INT. RDC, S.a.r.L: IIB-DG acquires DAM DEVELOPMENT INT. RDC, S.a.r.L on APR 18, 2022, for Supporting the efforts of various governments in Africa and beyond in their quest to reduce the unemployment situation. Improving foreign exchange. Improving national strategic stocks in DRC and beyond. Taking advantage of expected benefits that will arise from the petroleum hub project (a $50B ticket project) currently being promoted by the Government of DRC. The project proposes to construct a 300,000 barrels per day crude oil processing refinery. The refinery will be designed to be integrated and self-sufficient and will be delivered as a complete package with the required power backups. The complete package will comprise the following processing units.

MR TCHUKUBUTA BYAOMBE NEHRMIE: The intention is that the CSR & DAM RDC SARL is to develop 300, 000 barrels per day of oil refinery in the DRC. It will be located in the KARAMBA area in Fizi territory, South Kivu Region. The total estimated cost of the project is $11.27 billion. The money will be used to obtain and procure EPC contractors to construct the facility. This oil refinery project is owned by DAM DRC SARL and CSR Solutions.

Contact Information

  • Global Headquarters: WASHINGTON
    1050 Connecticut Ave. NW, 10th Floor
    Washington, District of Columbia 20036
    United States of America
    Phone: 571-207-0211
    Fax: 202-217-4050
    info@iibdevelopmentgroup.com
  • Harare Office
    5th Floor, Shanda House,
    17 Park Street
    Postal Address
    P.O. Box ST 523,
    Southerton,
    HARARE
    Tel:+263 (4) 706-762 / 252-224 / 752-616
    Fax:+263 (4) 250-539
    Cell:+2637-1240-0523 / 912-571-317
    info@cnmybj.co.zw
  • Bulawayo Office
    3rd Floor, Fidelity Life Centre,
    Cnr 11th Avenue/Fife Street
    Postal Address
    P.O. Box FM 254,
    Famona
    BULAWAYO
    Tel:+263 (9) 75-709 / 75-719
    Fax:+263 (9) 75-719
    cnmybjbyo@gmail.com

Visitor Counter: